Power Maintenance Guide - CTL2/CTL3 & BSC2/BSC3
Overview
This guide is designed to help you identify and resolve power-related issues in your TraffiCalm Flashing Sign System. It includes steps for checking system fuses, testing battery voltages, and ensuring proper solar panel connections.
Applicable Models
This troubleshooting guide addresses power issues related specifically to Top of Pole controllers and collaborators. It applies to the following TraffiCalm devices involved in these setups:
- M75-SA300-CTL2
- M75-SA300-CTL3
- M75-SA300-CLB2
- M75-SA300-CLB3
- M75-SA30M-BSC2
- M75-SA30M-BSC3
- M75-SA300-BSC2
- M75-SA300-BSC3
- M75-SA30M-CTL2
- M75-SA30M-CTL3
- M75-SA30M-CLB2
- M75-SA30M-CLB3
- Multimeter or voltmeter
- Screwdriver (Phillips-head)
Checking and Replacing Fuses
Glass Barrel Fuse (5 amp)
- Location: On the back of the unit, accessible with a 1/4 quarter turn.
- Purpose: Protects the system from overcurrent. Replace with a time delay or slow blow fuse if blown.
Blade Fuse (5 amp)
- Location: Behind the plexiglass window on the electronics tray.
- Action: Check and replace if necessary with a standard 5 amp blade fuse.
Battery and Solar Voltage Checks
Battery Voltage Levels
- Normal Range: 12.4 - 14.2V DC.
- Low Voltage Threshold: Below 10.4V may prevent system recovery without recharging to at least 12.4V.
- To test individual batteries, disconnect one wire from the battery terminal and use a voltmeter to measure. This prevents the combined voltage from affecting the reading.
Solar Panel Output
- Expected Output: 17-21V on sunny days; above 14V even on cloudy days.
- Connection Check: Ensure the positive and negative are correctly connected. A negative reading indicates reversed connections.
Battery Access and Maintenance
Accessing Batteries
- Locate the battery doors on the side of the controller or collaborator. These provide access to the wiring connections and allow for battery replacement.
Battery Replacement
- To replace, slide out the old battery and connect the new one to the appropriate terminals.
Testing Batteries
- Test the voltage of each battery individually to ensure they are between 6-7V DC.
Battery doors open to reveal terminals.
Replacement Parts
Here’s a table of common replacement parts you might need:
Part |
Description |
Part Number |
Battery |
BATTERY AGNI 6VOLT 12.0 AH (2pcs) |
<029-05162-0000> |
Glass Fuse |
FUSE MINI SLOW BLOW 5A 25OV |
<029-05285-0000> |
Blade Fuse |
FUSE-BLADE TRM & SPECIAL 32V 5A |
<029-03590-0000> |
Final Checks
After replacing any parts or making adjustments:
- Ensure all connections are secure.
- Power on the system to check operational status.
- Monitor the system for any irregularities during initial reactivation.
Images
Test Solar & Battery Voltage here.
Test Battery Voltage here if meter leads don't fit.
This guide should provide you with the necessary steps to troubleshoot and fix power issues in your flashing sign system. If the problem persists, it may be advisable to contact TraffiCalm technical support for further assistance.
Other Power Maintenance Guides
E-Box
S-Box
Related Articles
Power Maintenance Guide - CTLE & CTLA
Overview This guide is designed to assist you in identifying and resolving power-related issues with the side-of-pole mounted E-Box. The E-Box can be configured for either Solar or A/C power. Note that our circuit boards require DC power; therefore, ...
Power Maintenance Guide - CTLS & CLBS
Overview This guide is designed to help you identify and resolve power-related issues in your TraffiCalm Flashing Sign System. It includes steps for checking system fuses, testing battery voltages, and ensuring proper solar panel connections. ...
CTL2/CTL3 Controller Setup Guide
Overview This guide provides step-by-step instructions for installing CTL2 and CTL3 models, which are Solar Engine-Integrated Controllers or Collaborators. These systems are designed for easy mounting to poles or existing infrastructure, featuring an ...
E-Box Controller Setup Guide
Overview The "E-Box" series controllers, including the CTLE and CTLA models, are designed for convenient side-of-pole mounting, providing easy access and integration. These fiberglass enclosures streamline the installation process and offer robust ...
S-Box Controller Setup Guide
Overview The S-Box series controllers, including the CTLS and CLBS models, are designed for robustness and the ability to handle large-capacity batteries and solar panel units. These units are ideal for more complex integrations or to withstand ...